{"id":4074,"date":"2024-11-13T15:36:17","date_gmt":"2024-11-13T14:36:17","guid":{"rendered":"https:\/\/www.pipeline-equipment.de\/pipeline-wordpress-update-2025\/blog\/sueddeutsche-erdgasleitung-arge-sel-01\/"},"modified":"2025-02-05T14:18:17","modified_gmt":"2025-02-05T13:18:17","slug":"sueddeutsche-erdgasleitung-arge-sel-01","status":"publish","type":"blog","link":"https:\/\/www.pipeline-equipment.de\/en\/blog\/sueddeutsche-erdgasleitung-arge-sel-01\/","title":{"rendered":"&#8220;S\u00fcddeutsche Erdgasleitung (SEL)&#8221;: ARGE SEL 01 \/ DN 1200"},"content":{"rendered":"\n<p><p>As part of the important infrastructure project of the South German natural gas pipeline (<strong>SEL<\/strong>), the <strong>ARGE 01 \/ DN 1200<\/strong> consortium is contributing to a secure energy supply in southern Germany and at the same time paving the way for the future use of hydrogen as an energy carrier.<\/p><\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Project overview: Southern German natural gas pipeline and energy transition<\/h2>\n\n<p><p>The project involves laying a <strong>24-kilometer section<\/strong> of the South German natural gas pipeline, which extends over a total distance of <strong>250 kilometers<\/strong>. The pipeline runs through the state of <strong>Baden-W\u00fcrttemberg<\/strong> and is designed to transport not only natural gas but also hydrogen from around <strong>2030<\/strong>. This makes the SEL an important component of the energy transition, as it promotes a CO\u2082-neutral energy supply for the region and the phasing out of coal-fired power generation.<\/p><\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Customer and partner: Implementation of the South German natural gas pipeline<\/h2>\n\n<p><p>The project is being implemented jointly by several well-known companies: <strong>PPS Pipeline Systems GmbH, FRIEDRICH VORWERK Group SE, HABAU Hoch- und Tiefbaugesellschaft m.b.H.<\/strong> and <strong>Bohlen &amp; Doyen Bau GmbH<\/strong>. With a high level of expertise and the many years of experience of these companies, the realization of the project is being successfully driven forward.<\/p><\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Construction period: Scheduled completion of the pipeline by the end of 2024<\/h2>\n\n<p><p>Construction work on the pipeline section from Heilbronn to L\u00f6chgau began at the <strong>end of 2023<\/strong> and is expected to be completed by the <strong>end of 2024<\/strong>. One particular success of the project is that it was <strong>completed on schedule<\/strong>, which contributed significantly to meeting the budget and the project timeline.<\/p><\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Products and technology: Materials and machines for the pipeline<\/h2>\n\n<p>Various specialized products and machines were used to lay the pipes, which met the high safety and efficiency requirements:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><p><a data-mce-href=\"\/?p=1794\" href=\"https:\/\/www.pipeline-equipment.de\/en\/pipe-lowering-in-belts\/\">Pipeline lifting belt mats<\/a> for safe and gentle installation<br\/><\/p><\/li>\n\n\n\n<li><a href=\"https:\/\/www.pipeline-equipment.de\/en\/pipe-night-caps\/\">Night caps<\/a> to protect the pipe ends<\/li>\n\n\n\n<li><p><a data-mce-href=\"https:\/\/www.pipeline-equipment.de\/en\/rough-centering-for-precise-welding\/\" href=\"https:\/\/www.pipeline-equipment.de\/en\/external-line-up-clamps\/\">External line-up clamps<\/a> for precise alignment of the pipes<br\/><\/p><\/li>\n\n\n\n<li><p>Abrasive wheels and <a data-mce-href=\"\/?p=1334\" href=\"https:\/\/www.pipeline-equipment.de\/pipeline-rundbuerste-zur-schweissnahtbearbeitung\/\">round brushes<\/a> for surface treatment<br\/><\/p><\/li>\n\n\n\n<li><p><strong><a href=\"\/?p=594\" data-mce-href=\"https:\/\/www.pipeline-equipment.de\/en\/morooka-dumper\/\">Raupendumper<\/a><\/strong> von <strong>Morooka<\/strong> und <strong>Hitachi<\/strong> zur effizienten Materialbewegung<\/p><\/li>\n<\/ul>\n\n<p>These high-quality products and machines enabled the pipeline to be laid quickly and safely.<\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Services provided by Pipeline Equipment<\/h2>\n\n<p><p><strong>Pipeline Equipment<\/strong> provided comprehensive support in this project in the form of:<\/p><\/p>\n\n<ul class=\"wp-block-list\">\n<li><p><strong>Advice and tool planning<\/strong>: We provided advice during the planning phase in order to determine the optimum equipment for the construction site.<\/p><\/li>\n\n\n\n<li><p><strong>On-site maintenance and replacement service<\/strong>: A maintenance and replacement service ensured that tools and machines were always ready for use and could be replaced directly on site if necessary.<\/p><\/li>\n<\/ul>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<h2 class=\"wp-block-heading\">Conclusion: ARGE SEL 01 pipeline project for sustainable energy<\/h2>\n\n<p><p>The <strong>ARGE SEL 01 \/ DN 1200<\/strong> project for the <strong>southern German natural gas pipeline<\/strong> is a pioneering step for the energy supply in southern Germany. The possibility of transporting hydrogen from the 2030s onwards gives the project a sustainable perspective and offers long-term flexibility. Thanks to the good planning, the high-quality materials used and the professional support from <strong>Pipeline Equipment<\/strong>, the project was completed on schedule and without any major challenges on site &#8211; a success that supports both regional supply security and the energy transition in Germany.<\/p><\/p>\n\n<div style=\"height:50px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n<p><\/p>\n","protected":false},"featured_media":2726,"template":"","class_list":["post-4074","blog","type-blog","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.pipeline-equipment.de\/en\/wp-json\/wp\/v2\/blog\/4074","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.pipeline-equipment.de\/en\/wp-json\/wp\/v2\/blog"}],"about":[{"href":"https:\/\/www.pipeline-equipment.de\/en\/wp-json\/wp\/v2\/types\/blog"}],"version-history":[{"count":3,"href":"https:\/\/www.pipeline-equipment.de\/en\/wp-json\/wp\/v2\/blog\/4074\/revisions"}],"predecessor-version":[{"id":4503,"href":"https:\/\/www.pipeline-equipment.de\/en\/wp-json\/wp\/v2\/blog\/4074\/revisions\/4503"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.pipeline-equipment.de\/en\/wp-json\/wp\/v2\/media\/2726"}],"wp:attachment":[{"href":"https:\/\/www.pipeline-equipment.de\/en\/wp-json\/wp\/v2\/media?parent=4074"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}